Loving Engineering provided project management and assured on time delivery of the individual project components for this 26-lot residential subdivision funded by the American Recovery and Reinvestment Act of 2009 (ARRA). Project components included a topographic survey, wetland delineation, environmental assessment, geotechnical investigation, cultural resources report, civil engineering and traffic study. Loving Engineering provided professional civil engineering services including the design of the new road to serve the residential lots and a stormwater management design for the new impervious areas associated with the road. Loving Engineering coordinated with the Bureau of Indian Affairs (BIA) who determined the significance of the impacts to the environment as a result of the proposed development. The BIA published a Finding of No Significant Impact (FONSI). Loving Engineering also coordinated with the Port Gamble S’Klallam Tribal Historic Preservation Office who provided a letter of support to the State DAHP. The project culminated with Loving’s comprehensive project report providing all the technical reports described above.

Loving Engineering designed the interior residential road serving the future home lots. Technical standards and guidelines followed in the road design process included the AASHTO Green Book “A Policy on Geometric Design of Highways and Streets,” Manual of Uniform Traffic Control Devices (MUTCD), AASHTO Roadside Design Guide, AASHTO Guidelines of Geometric Design of Very Low-Volume Local Roads (ADT less than or equal to 400), Federal Lands Highway Project Development and Design Manual, IRR Program Design Standards, WSDOT Standard Specifications for Road, Bridge and Municipal Construction, and the Kitsap County Road Standards (2007).

Loving Engineering performed a stormwater analysis using the Western Washington Hydrology Model 3 (WWHM3). A stormwater management system is designed to infiltrate or disperse all new impervious areas created within the right-of-way on the site. In addition, all pervious areas across the entire site are directed to the stormwater management system, unless the areas are dispersed through compost amended soils. The model analyzes rainfall events between 50% of the 2 year event and the 50 year event using EPA’s HSPF (Hydrological Simulation Program – Fortran). The stormwater management system includes a number of rain gardens designed to infiltrate the stormwater generated onsite, especially the impervious areas within the roadway. Rain gardens provide not only management of peak flows on the site, but also provide basic water quality treatment.

  • Project: East Salmonberries
  • Date: 2011
  • Construction Value $720,000